Home/Pet Care/Odour Remover

Odour Remover除味剂

Kennel, urine stain and fabric odour. Enzymatic and masking routes both available. MOQ from 2,000 units. Sampling and tooling: costed with the formula and bottle, itemised in the quote. The plant holds ISO 9001:2015 (cert. 749435, valid to 2027-08-17) and CGMP-ASEAN (912/GCN-QLD, renewal in progress).

MOQfrom 2,000 units per SKU
Pack formatsFinished spray or refill
Sampling & toolingCosted with the formula and bottle, itemised in the quote
In the product cataloguePet cleaning & odour control →

Formulas we already run4 formulas

Every formula below is already in production at our plant. Use it as it is, or adapt the scent, texture and packaging to your brief.

Pet cleaning & odour control4 items

  • PET ODOUR ELIMINATOR
  • CAT LITTER DEODORIZER
  • CLEANING AND ODOUR CONTROL PET
  • URINE STAIN AND ODOUR REMOVER
See this group →

All styles2 styles

Every style has its own page with photos and specs.

Urine Stop

01Urine Stop

Single productfrom 2,000 units
Pet deodorising sets

02Pet deodorising sets

Multi-unit setfrom 2,000 units

How this category is boughtPROCUREMENT

The four steps below are the fixed path from inquiry to shipment for this category. What you get at each step, and how long it takes, is written on the linked pages — so you do not have to ask twice.

  1. Feasibility first. Send the formula direction, pack format and target market. If we cannot do it, we say so up front — check what we turn down before you write.
  2. Samples. In-stock samples ship in 3–7 days; custom samples take 7–10 working days from formula and bottle confirmation, up to 3 rounds free, with international freight outside Vietnam on your account.
  3. MOQ. This category is from 2,000 units, counted per SKU. A specific style may differ — every one is listed on the MOQ page.
  4. Quote and shipment. FOB Cat Lai (Ho Chi Minh City). The quote states what is included, what is not, the volume tiers and how sampling is charged — all six items are listed under documents we issue.

Frequently asked 7 Q&A

What is the MOQ for odour remover?
from 2,000 units. For a specific style the figure is recosted against the bottle and the formula, and itemised in the quotation.
What pack formats can you ship odour remover in?
Finished spray or refill.
How does sampling work, and how long does it take?
Costed with the formula and bottle, itemised in the quote. 1–3 stock samples are free and ship in 3–7 days.
What happens between an enquiry and production?
Day 0 we come back with a feasibility call; days 1–3 with a quote and stock samples; then sampling against the agreed formula and bottle; production once the sample is signed off.
Can this carry my own brand?
Yes. Under OEM you bring the formulation and packaging and we make to your spec; under ODM you bring a concept and a target market and we match or develop it; OBM and private label mean selecting from products already in production and applying your brand.
Does odour remover need testing?
It does. The finished report we show covers 8 tests — 3 heavy metals, 5 microbiological — run at SAIGONSTC (VILAS 943, ilac-MRA), issued and stamped by the lab. Which tests your product needs is set by the category and the target market; we come back with a testing plan. Your product gets its own report — we do not hand you this one instead.
Where is the plant, and can I visit?
Tan Duc Industrial Park, Tay Ninh Province, Vietnam — 15,000 sqm, 24 production lines. Visits can be arranged at any time. Walk the plant against the photographs on this site — the aerial view, the emulsifying rooms, the filling station, the QC lab and the warehouse all line up.
For a quote, tell us the category, target market and first-order volume.
Three lines, and the first reply can answer you
  1. CategoryWhich category, or simply "like that product of yours" — more useful than a formula name
  2. VolumeRoughly how many units or kilograms, per SKU
  3. MarketThe destination decides access and labelling — one formula going to the EU and to the US is not one set of documents

You get three answers back: whether it is feasible, the MOQ, and how sampling works. If it does not fit our lines, we say so in the first email instead of the third meeting.